Project

·Beijing Asuwei Household Waste Integrated Treatment Plant (2000t/day);
·Shanghai Qingpu Household Waste Integrated Treatment Plant (1000t/day);
·Inner Mongolia Tongliao Household Waste Treatment Plant (800t/day);
·Kyrgyzstan Wastes Composting Treatment Plant (1000t/day);
·Korea Pyongyang Household Waste Treatment Plant (600t/day);
·Anhui Bozhou Household Waste Landfill Plant (400t/day);
·Hubei Badong County Waste Landfill Plant (100t/day);
·Hubei Zigui County Waste Landfill Plant (50t/day);
·Hubei Xingshan County Waste Landfill Plant (50t/day);
·National Stadium Waste Transfer Station (50t/day);
·China CCTV (new location) Waste Transfer Station (20t/day);


Beijing Asuwei Household Waste Integrated Treatment Plant  
(Beijing 2008 Olympic Games key facilitated project)
Project briefs: located in Xiaotangshan town, Changping District, Beijing. Treatment capacity 2000 t/day, occupies 67000 square meters area. World’s leading treatment methods applied, including high-efficiency sorting, dynamic rotary-drum digestion and secondary aerobic window composting. Over 80% re-usable materials such as plastics, metals, combustible materials and organics can be re-cycled and re-used, which achieves the maximum volume reduction, harmfulness removal and recycling and re-use.